
- Home
- Solutions
- Transportation
- Design - Feasibility
- All

CSC Package-2
Read more
Peelibanga package-EWC-N
Read more
Package-16
Read more
Gurgaon-Chandu-Badli
Read more
Chitawa Package-19
Read more
DSC-4-DPR
Read more
DSC-4-Construction Supervision Consultancy
Read more
Proof Checking Consultancy of Bridges (UDRP/PWD/B/SC/01)
Read more
Supervision Consultancy of Bridges (UDRP/PWD/B/SC/01)
Read more
Parwanoo - Solan
Read more
Alwar, Bharatpur & Jaipur
Read more
Kaithlighat to Shimla section
Read more
DPR for Alwar District Pkg No. RJ-02-02
Read moreBarmer-Sindari-Jalore
Development of the Project shall include construction of the Project. Two laning of the Project shall include a wider carriageway and the roadway width shall be 12 m and carriageway shall be 7 m wide. The Type of Pavement shall be flexible, except for the sections at all Toll Plazas including tapering zone which shall be rigid.
Read more
DPR for Alwar District Pkg No. RJ-02-05
Read more
Bathinda -Barnala Dhuri Railway Section
Read more
Biaora-Dewas section
Read more
DPR for Pratapgarh-construction of two lane
Read moreMandsaur
Read more
DPR for Haveri-Yekambi
Read more
DPR for Ambala-Shazadpur
Read more
Drone Survey in Panipat -Jalandhar
Read more
Supervision in Meka-Roing-Hunli
The existing Meka-Roing-Hunli road having length of 89.7 kms presetly has CI-9 (MDR) surfaced specifications. The entire road passes through hilly terrain in Lower Dibang Valley district of Arunachal Pradesh. The Project Highway in Arunachal Pradesh under package of SARDP-NE shall include the land, buildings, structures and road works and is a Greenfield alignment to be constructed new.
Read more
DPR for Pkg -HP/Shimla/04Sml
Read more
DPR for Pkg -HP/Shimla/12Sml
Read more
DPR for Pkg -HP/Shimla/25Sml
Read more
DPR for Mandsaur
Read more
Raisinghnagar - Pugal
Development of the Project Highway shall include design and construction of the project highway. Two-Laning with paved shoulder shall include widening and strengthening of the Project Highway. Service roads at 9 chainages shall be constructed at a design length of 15.782 km on both sides.
Read more
Supervision in Pipli ? Bhavnagar
Read moreBanar-Bhopalgarh-Kuchera
The project includes Development & Upgradation of Banar-Bhopalgarh-Kuchera Road (SH-63) km 0 to 126.500 to 2 lane/4 lane standards. The project highway shall be widened to 2-lane with Granular Shoulders/ 4-lane/2-lane with Paved Shoulders. The width of each lane shall be 3.5 m and paved shoulder shall be of width 1.5m.
Read more
Supervision Services for O&M in Bhilwara - Ladpura
Read more
IE Services in Chidambarm
Read more