Consultancy services for authority?s engineer for supervision of construction of six laning of dedicated port road to krishnapatnam port (package-i) km 0+000 to km18+000 on epc mode in the state of andhra pradesh under bharatmala pariyojana phase I
Development of the Project shall include construction of the Project. Six Laning of dedicated Port road to Krishnapatnam Port (Package-1) Km 0+000 to Km 18+000 on EPC Mode including Minor Bridges, Culverts, Junctions, Bus shelters, drains etc. It shall include Six-Lanning with paved shoulder of the Project Highway.
The paved carriageway shall be 21 m of lane width and 3.0 m of paved shoulder. The total highway length shall be 19 km including Fly Over.
- Underpass/Flyover = 5
- RCC Box = 5 (1x12)
- VUP = 4
- LVUP = 2
- Grade Separated Structure = 1
- Flyover – PSC Girder (2x14.5)
- Flyover (NH-16) = 1
- Widening/Overlay with Built-up Area = 7
- VUP = 4
- LVUP = 1
- Toll Plaza = 1
- Major Junctions = 1
- Minor Junctions = 5
- Reconstruction of Pipe Culvert = 2
- Reconstruction of Slab Culvert – 1
- Widening of Existing Pipe Culverts = 15
- Reconstruction of Existing Slab Culverts = 2 (1x4.81)
- Major Bridges = 1
- Minor Bridges = 2
- Grade separated Structures
- Flyover – PSC Girder =1
- VUP – RCC Box = 4
- LVUP – RCC Box = 1