Consultancy Services for Authority's Engineer for Supervision of "Construction of 4/6 laning from Km 132.375 to Km 158.058 (Total New Alignment length of 20.683 Km) of Daboka Dimapur Section (Dimapur Bypass) of NH-36 & 39 in the state of Nagaland and Dinapur Bypass (Assam Portion) from existing Km 159.400 of NH-36 to existing Km 102.500 of NH-39 and upto end point of Assam portion (Design Km 118.050 to design Km 132.375) (Length 14.325 Km) in the state of Assam under SARDP-NE on Engineering Procurement and Construction basis'
Development of the Project shall include construction of the Project. The construction of Four Lane with paved shoulder from Km 132.375 to Km 153.058 of Dimapur Bypass shall be undertaken. Service roads shall be constructed at 5 design locations and fot a total length of 3.130 km.