Odisha
Development of the Project Highway shall include design and construction. Two lane with paved shoulder shall include strengthening of existing SL/IL. Two-Lanning with paved shoulder shall be undertaken. The carriageway shall be 7.0 m with 1.50 m paved shoulder on either side uniformly throughout the stretch.
Read moreYamunanagar-Panchkula (Package-3)
The Site of the Four Lane Divided Project Highway comprises the section of National Highway NH-73 commencing from km 160+357 to km 179+249 which is the part of Yamuna Nagar Panchkula section in the State of Haryana. Service roads at 8 chainages shall be constructed at a design length of 4.636 km on both sides.
Read moreLaddowal Bypass
The site of project includes construction of a dedicated Laddowal Bypass. The proposed bypass is taking off from designated leg of grade-separated junction of Southern Bypass with NH-95 running along Sidhwan Canal and passes via Laddowal Seed Farm at Ludhiana to meet NH-1 with an approximate length of 17.041 kms.
Read moreDimapur Bypass
Development of the Project shall include construction of the Project. The construction of Four Lane with paved shoulder from Km 132.375 to Km 153.058 of Dimapur Bypass shall be undertaken. Service roads shall be constructed at 5 design locations and fot a total length of 3.130 km.
Read moreKrishnapatnam Port
Development of the Project shall include construction of the Project. Six Laning of dedicated Port road to Krishnapatnam Port (Package-1) Km 0+000 to Km 18+000 on EPC Mode including Minor Bridges, Culverts, Junctions, Bus shelters, drains etc. It shall include Six-Lanning with paved shoulder of the Project Highway.
Read moreMadurai- Chettikulam
The Project Highway comprises of construction of 4-lane elevated highway and ground level improvement. The elevated highway shall include 4-lane divided carriageway, 2-lane carriageways on Gokahle road, Alagar Koil road and Mattuthavani road. Service roads shall be constructed at a design length of 7.3 km on both sides.
Read moreShamlaji
The project road starts from Rajasthan/Gujrat Border at Km 401+200 of NH-8 and ends near Ahmedabad. The road passes through the Aravali, Sabarkantha, Gandhinagar and Ahmedabad District of Gujrat. Service roads shall be constructed at a design length of 117.06 km on both sides.